BBHeatliner® Project

Steps that need to be taken for an effective implementation

Steps
1) Analysis phaseIdentification of possible objects and identification of the energy potential
2) Feasibility studyEconomic efficiency calculation and estimation of investment costs
3) PreplanningAnalysis of the conditions and organisation plan
4) Detail planning and tenderWriting and examination Authorisation procedure
5) Construction and initial operationCoordination of the individual contractors and processes

Objects and possible applications

at a glance

Sewer networkPublic environmentsSewage or mixed-water sewers
Industrial environments Process or cooling water channels
Sewer diameter Circular profile DN 300 – DN 1600
Oval profileDN 250/375 – DN 1300/1950
Heat exchanger length 20 m to 200 m
Wastewater temperature > 9 °C yearly average
Dry-weather drain > 8 l/s yearly average
  • Residential buildings
  • Industrial buildings
  • Hospitals
  • Hotels
  • Schools
  • Swimming pools